How to quote an electrical job

Scope electrical work room by room, price devices, circuits and permits, show license numbers where states ask for them, and keep deposits within limits.

An electrical quote wins when the customer can count what they’re getting, device by device, and sees before signing what the permit, the panel and any surprises will cost.

Scope: devices, circuits and the panel

List the work room by room: each device added or replaced, each new circuit and what it feeds, and any fixtures you supply. Say what the price assumes about the existing wiring and the panel’s spare capacity, and that if an opened wall proves otherwise, the extra work becomes a priced change the customer signs first. Name the exclusions, such as patching and painting after you fish wire, and who pulls the permit.

How electrical work is priced

Charge How it’s priced What the quote shows
Labor Hourly, with a minimum Rate, minimum, how time is counted
Device work Per device Count and room
Circuit or panel job Flat rate What the price includes
Materials Each, or an allowance Grade; any owner-supplied items
Service call Fee per visit Whether the repair absorbs it
Permit and inspection The fee Who pulls the permit

California sets what a small repair contract priced by time and materials must disclose (B&P §7159.10). On a service and repair contract, which among other conditions is home improvement work of $750 or less that the homeowner or tenant called you for, with nothing paid until it’s done, a time-and-materials contract must disclose the set rate, the estimated cost of materials and how time is computed, such as in quarter hours, with the statement “The actual contract amount of a time and materials contract may not exceed the estimated contract amount without written authorization from the buyer.”

License numbers on proposals and contracts

Some states name the documents that must carry your number or other details. For example:

  • Texas: TDLR’s penalty schedule for electricians counts leaving the contractor’s name, address, phone number and license number, or the Department’s information, off a proposal or written contract as a violation (TDLR). The rule, 16 TAC §73.51(f), sets out that information as the statement “Regulated by The Texas Department of Licensing and Regulation, P.O. Box 12157, Austin, Texas 78711, 1-800-803-9202, 512-463-6599; website:” plus TDLR’s web address, for proposals and written contracts as well as invoices (16 TAC §73.51(f)).
  • Florida: an electrical contractor’s registration or certification number must be stated in each offer of services, business proposal or advertisement, whatever the medium, and put on each building permit application (Fla. Stat. §489.521).
  • California: a licensed contractor’s number goes in all construction contracts, subcontracts and calls for bid, and in all forms of advertising (B&P §7030.5).
  • Pennsylvania: for home improvement priced over $500 at a private residence, a contractor under the state’s Home Improvement Consumer Protection Act (one whose home improvements reached $5,000 in the previous tax year) puts its registration number on all contracts, estimates and proposals with owners, and in its advertisements (73 P.S. §517.6).

Upgrades the customer can add

Price the job as asked, then list upgrades as optional items outside the total: dimmers instead of plain switches, extra outlets while the walls are open, whole-house surge protection or a circuit for an EV charger. Each gets its own line and price, so the customer can add one without a new quote.

How long the price holds

Give the quote a valid-until date. Material costs move, and a price accepted long after you wrote it may no longer cover them.

Deposits within state limits

Collect a deposit for materials you must buy before the job, and state the amount on the quote. The FTC advises homeowners against paying the whole price up front and notes that some states cap down payments (FTC), for example:

  • California: a home improvement contract’s down payment tops out at the lesser of $1,000 and 10 percent of the contract amount, and after it no payment may run ahead of the work performed or material delivered, unless you furnish a bond or joint control of the kind the section describes (B&P §7159.5).
  • Maryland: the law bars demanding or receiving any payment for a home improvement before the contract is signed, and caps a deposit received by signing at one-third of the contract price (Bus. Reg. §8-617).

Acceptance, change orders and cancelling

Get the customer’s signature and date on the quote, with the options they chose. A California home improvement contract over $500, unless it is a compliant service and repair contract, must include a change-order form, and a change order joins the contract only when it is written and signed by the parties before its work begins (B&P §7159).

If you close the sale in the customer’s home, check the FTC Cooling-Off Rule (16 CFR 429). Unless an exclusion fits, it reaches consumer purchases of $25 or more agreed at the buyer’s residence after you personally solicit them, invitation or not, and those buyers have until midnight of the third business day after the sale to cancel. Its duties at signing: explain that right out loud; print its cancellation statement beside the buyer’s signature in bold of 10 points or larger; hand over a fully completed, dated contract or receipt naming you and your address; and add a completed Notice of Cancellation form in duplicate. Payments go back within 10 business days after a cancellation notice arrives. State laws granting as much or more stay in force: in California, the buyer of home improvement work under a home solicitation contract has until midnight of the third business day after receiving a signed, dated copy, or the fifth for a senior citizen, and service and repair contracts follow a separate rule (Civ. Code §1689.6).

Lead-safe work in homes built before 1978

Electricians are on EPA’s list of special trade contractors its lead rule covers. Generally, paid work that disturbs paint in housing and child-occupied facilities built before 1978 requires certification (EPA), from EPA’s program or, where EPA has authorized one, your state’s (EPA). Boxes cut into painted plaster and wire fished through walls can exceed the rule’s minor-repair allowance, which ends at 6 square feet of painted surface per room indoors and 20 outdoors, and never covers prohibited or restricted practices, window replacement or demolition of painted surfaces. For a covered job, the owner must have EPA’s Renovate Right pamphlet within the 60 days before work begins, confirmed by their signed acknowledgment or a certificate of mailing at least 7 days before; where the owner lives elsewhere, an adult occupant gets one as well, as the rule details (40 CFR 745, subpart E).

Three mistakes that lose the job or the margin

  1. Guessing at the panel. A price that assumes spare capacity you didn’t check turns into a service upgrade you pay for.
  2. Leaving the patching unassigned. If the quote doesn’t say who repairs the drywall after you fish wire, the customer assumes you will.
  3. Per-device pricing with no minimum. A two-outlet call priced only per device may not cover the trip.
Create your quote

General information, not tax or legal advice.